I am excited about our group’s project. We have a clear objective, interdependent tasks, resources, and is a unique endeavor geared towards a specific customer (Gido & Clements pg. 6). We have been working on and implementing a baseline plan (pg.17) and have defined “the specific activieties that need to be performed…”(pg.83). I am working on the reflected ceiling plan, lighting plan and elevations along with bathroom fixture selections. Our project, though not complete, has a modern look tailored to our customer that is sure to satisfy. So far we have developed our preliminary designs and we will begin to work on our “detailed designs, including preparation of specifications, drawings, flowcharts, and a list of materials.” (pg. 91)
I’m not saying the other groups project is bad, but I do believe that they need to clean it up a bit and rethink some of their choices such as the stripper pole and mirrored ceilings. Also how is turning a column into a fireplace going to work? I think that their decorative pebbles should be limited to just the shower instead of the whole bathroom floor. They have definitely displayed the life of their project from their action agenda to preliminary designs and identifying what they need to do next.
No comments:
Post a Comment